Go to GreenTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
LCA Conventional Orange Crop Operations

Resource Stock Operation or Component Analyzer View

Progress

Introduction
This tool generates a variety of basic resource stock cost stock statistics for DevTreks components and operations.

Calculation View Description
v210a

Version: 1.9.0

Feedback About carbon/operationgroup/LCA Conventional Orange Crop Operations/760/operationsbprogress1

Step 1 of 3. Make Selections


Display Full View:

Stocks to Analyze

Choose up to 10:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Choose the type of analysis to run. Ensure that it coincides with the name of the analyzer being used.
  • Step 1. Stocks to Analyze: Choose up to 10 resource stock properties to analyze.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Math Properties: Choose optional algorithms and subalgorithms. Refer to the CTA tutorial for options.
  • Step 2. Media URL: Delimited string of Media URLs that explain the analysis.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
LCA Conventional Orange Crop Operations
Operation Group : LCA Conventional Orange Crop Operations ; A1001C
Operation AllAlt. 0Alt. 1Alt. 2
Name 2012 Conventional Orange Crop Operation2013 Conventional Orange Crop Operation2014 Conventional Orange Crop Operation
Date 12/31/201212/31/201312/31/2014
Label A1001C2012A1001C2013A1001C2014
Indicators AllAlt. 0Alt. 1Alt. 2
Target benchmarkactualactual
Date 12/31/201212/31/201312/31/2014
Score Observations 1.01.01.0
Score Plan Period 7,064.17321,668.56951,732.6881
Score Unit meanmeanmean
Score Plan Full 7,064.17320.00000.0000
Score Plan Cumul 7,064.17320.00000.0000
Score Actual Period 0.00001,668.56951,732.6881
Score Actual Cumul 0.00001,668.56953,401.2576
Score Actual Period Change 0.00000.00000.0000
Score Actual Cumul Change 0.00001,668.56953,401.2576
Score Plan P Percent 0.0000100.0000100.0000
Score Plan C Percent 0.00000.00000.0000
Score Plan Full Percent 0.00000.00000.0000
Score Low Plan Period 7,052.18521,665.75201,729.8216
Score Low Unit lower 90 % cilower 90% cilower 90% ci
Score Low Plan Full 7,052.18520.00000.0000
Score Low Plan Cumul 7,052.18520.00000.0000
Score Low Actual Period 0.00001,665.75201,729.8216
Score Low Actual Cumul 0.00001,665.75203,395.5736
Score Low Actual Period Change 0.00000.00000.0000
Score Low Actual Cumul Change 0.00001,665.75203,395.5736
Score Low Plan P Percent 0.0000100.0000100.0000
Score Low Plan C Percent 0.00000.00000.0000
Score Low Plan Full Percent 0.00000.00000.0000
Score High Plan Period 7,076.16121,671.38701,735.5546
Score High Unit upper 90 % ciupper 90% ciupper 90% ci
Score High Plan Full 7,076.16120.00000.0000
Score High Plan Cumul 7,076.16120.00000.0000
Score High Actual Period 0.00001,671.38701,735.5546
Score High Actual Cumul 0.00001,671.38703,406.9416
Score High Actual Period Change 0.00000.00000.0000
Score High Actual Cumul Change 0.00001,671.38703,406.9416
Score High Plan P Percent 0.0000100.0000100.0000
Score High Plan C Percent 0.00000.00000.0000
Score High Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name Nitrate LossNitrate LossNitrate Loss
Label NO3NO3NO3
Plan Period 6,004.56721,553.58101,578.9150
Unit kg N03-N / hakg N03-N / hakg N03-N / ha
Plan Full 6,004.56720.00000.0000
Plan Cumul 6,004.56720.00000.0000
Actual Period 0.00001,553.58101,578.9150
Actual Cumul 0.00001,553.58103,132.4960
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.00001,553.58103,132.4960
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name Ammonia LossAmmonia LossAmmonia Loss
Label NH3NH3NH3
Plan Period 2,843.1096678.8910632.1978
Unit kg N03-N / hakg N03-N / hakg N03-N / ha
Plan Full 2,843.10960.00000.0000
Plan Cumul 2,843.10960.00000.0000
Actual Period 0.0000678.8910632.1978
Actual Cumul 0.0000678.89101,311.0888
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.0000678.89101,311.0888
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name Nitrous Oxide EmissionsNitrous Oxide EmissionsNitrous Oxide Emissions
Label N2ON2ON2O
Plan Period 710.7996169.1535158.0553
Unit kg N2O-N / hakg N2O-N / hakg N2O-N / ha
Plan Full 710.79960.00000.0000
Plan Cumul 710.79960.00000.0000
Actual Period 0.0000169.1535158.0553
Actual Cumul 0.0000169.1535327.2088
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.0000169.1535327.2088
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name Global WarmingGlobal WarmingGlobal Warming
Label CO2CO2ACO2A
Plan Period 330.24727,940.37058,195.4639
Unit kg CO2 equivskg CO2 equivskg CO2 equivs
Plan Full 330.24720.00000.0000
Plan Cumul 330.24720.00000.0000
Actual Period 0.00007,940.37058,195.4639
Actual Cumul 0.00007,940.370516,135.8344
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.00007,940.370516,135.8344
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name AcidificationAcidificationAcidification
Label SO2ASO2ASO2A
Plan Period 488.6664111.6190105.3702
Unit kg SO2 equivskg SO2 equivskg SO2 equivs
Plan Full 488.66640.00000.0000
Plan Cumul 488.66640.00000.0000
Actual Period 0.0000111.6190105.3702
Actual Cumul 0.0000111.6190216.9892
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.0000111.6190216.9892
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name EutrophicationEutrophicationEutrophication
Label NO3ANO3ANO3A
Plan Period 932.8884214.0265199.0287
Unit kg N03 equivskg N03 equivskg N03 equivs
Plan Full 932.88840.00000.0000
Plan Cumul 932.88840.00000.0000
Actual Period 0.0000214.0265199.0287
Actual Cumul 0.0000214.0265413.0552
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.0000214.0265413.0552
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name EutrophicationEutrophicationEutrophication
Label NO3ENO3BNO3B
Plan Period 5.150429.9690112.3902
Unit kg N03 equivskg N03 equivskg N03 equivs
Plan Full 5.15040.00000.0000
Plan Cumul 5.15040.00000.0000
Actual Period 0.000029.9690112.3902
Actual Cumul 0.000029.9690142.3592
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.000029.9690142.3592
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name AcidificationAcidificationAcidification
Label SO2BSO2BSO2B
Plan Period 266.533216.134558.5351
Unit kg SO2 equivskg SO2 equivskg SO2 equivs
Plan Full 266.53320.00000.0000
Plan Cumul 266.53320.00000.0000
Actual Period 0.000016.134558.5351
Actual Cumul 0.000016.134574.6696
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.000016.134574.6696
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Dataset: LCA Conventional Orange Crop Operations IRI These operations use life cycle analysis for conventional orange production.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.